NVWS-REPLENISH-001 — Site-specific additional hydrological replenishment
DRAFT FOR CONSULTATION. NVWS v0.1 (October 2026). This is a proposed Nexus Water DAO LLC standard. It is not approved, adopted or independently assured. The methods have not been approved by an independent technical council. No Verified Water Credits (VWC) have been issued, and none are offered for sale. References to WRI, AWS, Gold Standard, ISO, EPA, FTC, SEC, CFTC or any other organization are not endorsements. Comments: josh@nexuswater.xyz
Version 0.1 · 2026-10-03 · Nexus Water DAO LLC
Status: proposed Nexus policy / technical draft. Not an approved or independently assured credit standard.
Required methodology specification
| Field | Proposed requirement |
|---|---|
| 1. Methodology ID | NVWS-REPLENISH-001 |
| 2. Version | 0.1-draft; proposed, not approved |
| 3. Effective date | None for live issuance; draft baseline 2026-10-03 |
| 4. Eligible activities | Managed aquifer recharge or other site-specific intervention with a validated hydrological model. Restoration, forests, soil practices and wetlands require activity-specific annexes; this umbrella draft does not approve a universal formula. |
| 5. Geographic applicability | Pilot-specific only after local permit, source-catchment and technical applicability review; no blanket global approval. |
| 6. Environmental objective | VWC-REPLENISH; method-specific additional recharge / instream availability; never a universal catch-all metric |
| 7. Project boundary | Connected source, vadose zone/aquifer or stream reaches, extraction points, travel time, storage, competing users, evapotranspiration and downstream flows. |
| 8. Water source | Identify official hydrogeological/catchment units and demonstrated hydraulic connectivity. Document permits, water quality, land/water rights and destination of retained water. |
| 9. Baseline rules | Calibrated without-project counterfactual accounting for rainfall, recharge, runoff, evapotranspiration, abstraction and background conditions. Use controls/model validation suitable for local hydrology. Document uncertainty and time lag before choosing a crediting period. |
| 10. Additionality rules | Apply the NVWS additionality policy (draft, publication pending); environmental counterfactual, regulatory and temporal tests required; method/project annex specifies practice and finance tests with evidence and rationale. |
| 11. Monitoring | Inflow/outflow, precipitation, soil/storage changes, infiltration where relevant, groundwater levels/quality, evapotranspiration model inputs, extraction and receptor response. Flow into a basin alone is insufficient. |
| 12. Devices | Calibrated, appropriately sized/installed meters with serial, unit, accuracy specification, commissioning and calibration history. Approved engineering models where the project annex permits; no brand endorsement implied. |
| 13. Equations | Conceptual only: G_t = max(0, H_project,t − H_baseline,t), where H is the specific validated beneficial hydrological outcome in m³ at the eligible receptor and time. E_t = max(0, G_t − U_t − L_t) × A_t. Each project annex must define and validate H; this draft intentionally provides no executable default recharge estimator. |
| 14. Uncertainty | Project annex defines uncertainty budget, missing-data rule, correlation/error propagation and chosen conservative deduction. No default confidence factor from evidence tier. Technical reviewer must approve parameters before real issuance. |
| 15. Leakage / adverse effects | Infiltration ≠ recharge ≠ available beneficial water. Exclude water that would have arrived anyway, evapotranspiration loss, displaced downstream benefits, induced abstraction and counted storage that is later released within the same accounting period. Model return/withdrawal timing and persistent versus annual benefit explicitly. |
| 16. Allocation | Explicit rights and pool-level allocation ≤100%; apply only once after conservative physical quantity. Coordinate utility and sponsor shares. |
| 17. Data quality | Immutable originals, aligned periods, explicit units/read types, calibrated instruments, anomaly resolution and source reconciliation; no unresolved material gaps. |
| 18. Verification | Independent qualified verifier and separate registry review; bind decision to exact baseline, calculation and evidence versions. |
| 19. Issuance schedule | Ex-post only, on complete approved monitoring intervals. One annual vintage is preferred where seasonal comparability requires it; no automatic annualization from a short sample. |
| 20. Crediting period | Project-specific, with annual eligibility/maintenance review. No guarantee of future issuance. Material baseline/operating change triggers revalidation. |
| 21. Reversal/correction | Later equipment failure stops future crediting; it does not automatically negate a valid past measured reduction. If prior data or hydrological conclusions were wrong, investigate, cancel active units and invalidate retired claims with append-only history. Stored or time-dependent benefit annexes must define actual reversal obligations. |
| 22. Reporting | Publish redacted PDD, method/version, boundary, metric, vintage, calculation, uncertainty, allocation, verifier opinion, serial batch and separately disclosed co-benefits. |
| 23. Claim language | The exact receptor-specific hydrological outcome defined in the approved annex, with timing and uncertainty; not permanent conservation by default. |
| 24. Exclusions | Rainfall captured credited directly, universal infiltration multiplier, unverified aquifer connectivity, inadequate groundwater-quality safeguards, forecasts credited as ex-post outcome. |
| 25. Double counting | Use the same physical outcome pool across overlapping methods; detect overlapping dates, evidence/meters and external claims. Apply the NVWS double-counting policy (draft, publication pending). |
| 26. Update history | 2026-10-03: first technical draft based on user brief; no technical council approval, field validation or public consultation completed. |
Worked example
HYPOTHETICAL EXAMPLE for arithmetic only: validated incremental eligible receptor availability 12,000 m³; uncertainty 1,500; adverse-effect deduction 500; allocated share 80% → 8,000 m³. No field inference or accepted coefficient is established by these numbers.
Approval blockers
Live issuance is disabled until a competent reviewer approves the specific baseline, boundary, uncertainty treatment, data-completeness criteria, measurement specifications, rights, safeguards and legal applicability. Publish technical consultation and council disposition. Examples and software calculations are not field validation. The REPLENISH methodology additionally requires an executable, independently reviewed site-specific hydrological annex.
Technical reference use
Use WRI VWBA 2.0 and applicable source-specific engineering as accounting references, not as certification of this formula. Consider AWS site/catchment context, EPA WaterSense specifications for applicable SAVE products, WQBA for quality effects and GHG Protocol for separately quantified carbon co-benefits. See the Nexus reference library (publication pending).